A surface mine has 15 identical dumpers and two shovels. For shovel 1, the dumper cycle time is 30 min and the shovel loading time is 5 min. For shovel 2, the dumper cycle time is 32 min and the shovel loading time is 4.0 min. Based on match factor optimisation (equitable match factor), the ideal allocation of dumpers to shovel 1 and shovel 2, respectively is

MCQ

6, 9

7, 8

9, 6

8, 7