Question

A mine is being developed by bord and pillar method with a gallery size of 4.8m×2.4m4.8 \, \text{m} \times 2.4 \, \text{m}. The mine operates in 3 shifts per day and 6 faces are blasted per shift. The average pull per round of blast is 1.2m1.2 \, \text{m} and the bulk density of coal is 1.4t/m31.4 \, \text{t/m}^3. If the OMS is 2.52.5, then the average manpower deployed in the development section per shift is ______.

NAT

Min: 46 Max: 47

Answer: 46.5