A longwall panel of width 120 m is extracted at a depth of 200 m. Critical subsidence is reached when the panel length becomes 150 m. If the seam were to be worked at a depth of 300 m, critical subsidence would be observed at a panel length, in m, of ______.
Min: 225 Max: 225
Answer: 225
India's No. 1 test series for GATE Mining exam
© 2024-2025 examtestseries.com
All rights reserved.