A double ended ranging drum shearer is employed in a longwall mine of face length 150 m. The mining height is 3.5 m and depth of the web cut is 0.76 m. The cycle time for unidirectional cutting is 40 min. Considering bulk density of the coal to be , hourly production from the face in tonne is ______.
Min: 835 Max: 840
Answer: 837.5
India's No. 1 test series for GATE Mining exam
© 2024-2025 examtestseries.com
All rights reserved.